
KUSTAT
KUSTAT Building Power 5 * 7MM Micro Stepper Motor, Two-Phase Four-Wire Stepper Motor with Long Lead Screw, 3-5V DIY Micro Stepper Motor Engineering Repair
50,34 €
83,90 €
-
Order within to get between
-
Tracked Shipping on All Orders
-
14-Day Returns
- Secure Payments
-
24/7 Customer Support
Description
- Model: Two-phase four-wire stepping motor
- Motor specification: 5*7MM
- Weight: 6g
- exquisite workmanship: Exquisite workmanship, smooth metal surface without obvious scratches.
- stable property: High moment of force, strong power, stable rotating speed.
Shipping and Returns
- We offer tracked shipping on all orders. Tracking information will be shared as soon as the order is dispatched.
- Please check the delivery estimate before adding a product to the cart. This is displayed for every product on the website.
- Available shipping methods and charges will be displayed at the time of checkout, depending on your exact location.
- All customers are entitled to a return window of 14 days, starting from the date of delivery of the product(s).
- Customers are advised to read our return policy for details of the return process, eligibility, refunds as well as cancellations or exchanges.
- In case of any issues or concerns about Shipping or Returns, please contact us and we will be happy to help.
KUSTAT.
KUSTAT Building Power 5 * 7MM Micro Stepper Motor, Two-Ph...
50,34 €
83,90 €